22:11 | Pulled in two needed fixes. check-in: 3936bce446 user: matt tags: v1.80 | |
21:53 | corrected misnamed funciton Leaf check-in: a9180a343b user: matt tags: v1.80-refactor-fix1 | |
18:34 | Changed version to 1.8006 check-in: 302c2637e5 user: mmgraham tags: v1.80 | |
18:21 |
Normalize toppath for /tmp db area to address weird csh /home/matt/data/megatest vs. pwd.
Get DEADs after a while. There is a crash related to connection handling. check-in: e2a27caa33 user: matt tags: v1.80 | |
2023-01-16
| ||
10:00 |
Major refactor/clean up of client connection stuff. Removed old crufty approach of having both client and server side calls in http-transport. Plan would be to eventually get rid of http-transport.
Open files slowly grows. bad argument type in http-transport. Line 285 (close-connection! fullurl) is wrong. check-in: 67b18cc991 user: matt tags: v1.80-refactor | |
04:20 | Original call to close-connections! was correct check-in: 883ba16e82 user: matt tags: v1.80 | |
03:32 | Isolated fix from v1.80-disconnected-tests for TCP ports issue (not tested yet) check-in: da2bac2043 user: matt tags: v1.80 | |
03:21 | Merged v1.80 Leaf check-in: ccccfdb50a user: matt tags: v1.80-disconnect-tests | |
2023-01-15
| ||
18:27 | Disconnecting tests from servers where possible to save connections. check-in: cdac5f3909 user: matt tags: v1.80-disconnect-tests | |
2023-01-13
| ||
13:37 | I guess close-idle-connections is not available? don't get it but getting rid of it... check-in: d310aee913 user: mrwellan tags: v1.80, v1.8005 | |
08:22 | Yet another db in transaction problem fixed. check-in: 95b6039c92 user: matt tags: v1.80 | |